MASDAR’S overall project philosophy is to procure on design-build basis a 50-year design life 6,000 TR Distributed District Cooling Plant, which will eventually be one the eight serving MASDAR City’s future build out. ADC has been awarded the project to design, procure and construction this first DDC plant after rigorous evaluation and verification process.
Project Scope / Highlights
Project
Masdar Distributed District Cooling Plant
Location
Masdar City, Abu Dhabi – UAE
Year
2016
Plant Sizes
6,000TR
Development / Client
Masdar
MASDAR, also known as the Abu Dhabi Future Energy Company, is a renewable energy company based in Abu Dhabi, United Arab Emirates. The company’s mission is to invest in renewable energy and clean technology in Abu Dhabi and around the world for both financial and social returns.
MASDAR City, as the world’s most sustainable eco-neighborhood, is designed by Abu Dhabi Future Energy Company to reduce energy and water consumption and features an integrated, smart transportation network that makes the community accessible and livable. The low-carbon, low-waste city will rely entirely on renewable energy.
The vision for the development is to achieve a sustainable footprint within the boundary of the city with resilience to allow the development and incorporation of future sustainable technologies as they mature.