Project Scope / Highlights

Supply, fabrication of steel structure for the Air Cooled Condenser.
The structure comprises of nearly 2000 Tons of structural steel that will be pre-fabricated and transported to site. Supply, fabrication of the low pressure steam ductwork connecting the turbine building and the ACC, along with distribution and bypass ducts. The steam duct will be in the range of 6.5 m diameter all down to 0.85 m in diameter. The duct when assembled shall be just over 700 Tons. The preassembly of the fans, motors, coils and necessary duct work to connect the ACC to the client’s steam turbine building.
The transportation and lifting of assembled modules into final position. The project is in JV partnership with technology provider.

Project

Dubai Energy from Waste Project – Air Cooled Condensers

Location

Dubai Energy from Waste Project, UAE, Dubai

Year

2023

Plant Capacity

The facility will process 1.9 million tonnes of municipal waste per year, produce approximately 200 MW of renewable electricity

Development / Client

BESIX and its partners carry out one of the world’s largest waste-to-energy plants to be built in a single phase. The facility will process 1.9 million tonnes of municipal waste per year, produce approximately 200 MW of renewable electricity.